Redefining Technology

Automotive OEM · Stage 01 of 06 · interactive process twin

Inward stage digital twin

The Inward stage is everything that happens before a part reaches the line: its 4 departments — Purchase / Sourcing, Logistics – Inbound, Supplier Quality and Stores / Warehouse — and their 20 business processes, crossed by the material flow on the road and the information flow above it. Select a department to see its processes.

MATERIAL FLOW · SUPPLIER TRUCK TO LINE SIDE · RETURNABLES BACK TO THE GATE

D1 · Purchase / Sourcing

Department 1 of 24 in the plant taxonomy

Purchase / Sourcing selects suppliers, agrees prices and contracts, raises purchase orders and rates supplier performance — the commercial start of every inbound part.

  1. 1.01Supplier selection and onboarding
  2. 1.02RFQ and costing
  3. 1.03Purchase order management
  4. 1.04Supplier development
  5. 1.05Contract and price negotiation
  6. 1.06Supplier performance rating

About this twin

From the supplier's gate to the line side

A supplier truck enters at the top, clears the gate, backs onto a dock and is received; the lot is inspected, put away in racks, kitted and milk-run to the line. Above the road, the documents that authorise each step run as a ribbon from RFQ to supplier rating — and most inbound delay comes from the two flows disagreeing.

Departments
4
Business processes
20
Flows drawn
2
Documents
12

How to read the process twin

Two flows cross four departments

The Inward stage runs as two flows through the same four departments: the material flow along the road at ground level, and the information flow as the ribbon of documents above it. Most inbound delay, dispute and stock error comes from the two disagreeing, so the twin draws them together.

  1. F1

    Material flow

    The physical path of a part: supplier truck, gate, dock, unloading, incoming inspection, bin location, kit or sequence, milk run to the line — and the returnable bins travelling back. It is governed by dock slots, FIFO and takt.

  2. F2

    Information flow

    The documents and postings that authorise and record each step: RFQ, purchase order, ASN or challan, gate entry, GRN, inspection result, put-away, Kanban call-off and the supplier rating that closes the loop back to sourcing.

  3. F3

    Controls that join them

    The checks that make the two flows agree: PPAP before series supply, the 3-way match of PO, GRN and invoice, lot acceptance at incoming inspection, cycle counting against the bin record, and FIFO and shelf-life enforcement in stores.

The Inward stage, department by department

Four departments and their 20 business processes

Inward is four departments — Purchase / Sourcing, Supplier Quality, Logistics – Inbound and Stores / Warehouse — with 20 business processes between them. Each process below is where a case study will sit; the first, on Receiving (GRN), is being written now.

  1. D1

    Purchase / Sourcing

    Purchase / Sourcing selects suppliers, agrees prices and contracts, raises purchase orders and rates supplier performance — the commercial start of every inbound part.

    1. Supplier selection and onboarding
    2. RFQ and costing
    3. Purchase order management
    4. Supplier development
    5. Contract and price negotiation
    6. Supplier performance rating
  2. D2

    Supplier Quality (SQA)

    Supplier Quality assurance approves parts before series supply (PPAP), audits suppliers, inspects incoming material and runs non-conformance and 8D cases back to the supplier.

    1. PPAP and part approval
    2. Supplier audits
    3. Incoming material inspection
    4. Supplier non-conformance and 8D handling
  3. D3

    Logistics – Inbound

    Inbound logistics runs the gate, the dock schedule and unloading, posts the goods receipt note (GRN), matches the invoice to the purchase order and receipt, and manages returnable packaging.

    1. Gate entry and vehicle check-in
    2. Receiving (GRN)
    3. Unloading and dock scheduling
    4. Invoice matching against the PO (3-way match)
    5. Returnable packaging and bin management
  4. D4

    Stores / Warehouse

    Stores / Warehouse holds received material in bin locations, controls inventory with cycle counts, enforces FIFO and shelf life, and kits, sequences and feeds parts to the line by milk run and Kanban.

    1. Material storage and bin locations
    2. Inventory control and cycle counting
    3. FIFO and shelf-life management
    4. Kitting and sequencing
    5. Line feeding (milk run, Kanban)

Case studies

Case studies from the Inward stage

Each case study is written against one business process of the Inward stage and filed under its department. 1 case study is listed so far, covering 1 of the stage’s 20 business processes.

  1. PublishedLogistics – Inbound · Receiving (GRN)

    GRN Automation: From Gate Entry to SAP Posting

    How an automotive OEM plant automates the goods receipt note: gate entry, matching invoices and purchase orders, supplier follow-up and the GRN posting in SAP.

The information flow in full

Twelve documents carry the Inward stage

Twelve documents and postings carry a part from quotation to line side. Each one is produced by one department, read by others, and lives in a named system — which is why inbound automation is mostly about getting these to agree.

DocumentProduced byRead bySystem of recordWhat it does
RFQPurchase / SourcingSuppliersSourcing / ERPOpens the quote; sets target cost and volumes
Purchase orderPurchase / SourcingSupplier, Inbound, FinanceERP (SAP MM)The authority to deliver; the anchor of the 3-way match
PPAP approvalSupplier QualityPurchase, InboundQuality systemReleases a part for series supply
ASN / delivery challanSupplierLogistics – InboundSupplier portal / EDITells the gate what is on the truck before it arrives
Gate entryLogistics – InboundDock schedulingGate system / ERPTime-in, vehicle, driver, dock allocation
Goods receipt note (GRN)Logistics – InboundStores, Finance, SQAERP (SAP MIGO)Confirms quantity received against the PO; starts inspection or put-away
Inspection resultSupplier QualityStores, PurchaseQuality system / ERP QMAccepts the lot into stock or holds it in quarantine
NCR / 8DSupplier QualitySupplier, PurchaseQuality systemRecords a non-conformance and the supplier's corrective action
Put-away / bin recordStores / WarehouseKitting, PlanningWMS / ERPWhere the lot is, its FIFO date and shelf life
Kanban / call-offStores / WarehouseLine, Milk runMES / e-KanbanThe line's pull signal for the next kit
Invoice (3-way match)Supplier → FinanceAccounts payableERP (SAP FI)Paid only when PO, GRN and invoice agree
Supplier ratingPurchase / SourcingSuppliers, SQASourcing / BIQuality, delivery and cost score fed back into sourcing

Frequently asked

Inward stage: frequently asked questions

Four questions cover what the Inward stage includes, how the material and information flows differ, what a goods receipt note is, and which processes carry case studies.

What does the Inward stage of an automotive plant include?

The Inward stage includes everything between choosing a supplier and feeding a part to the line: Purchase / Sourcing (supplier selection, RFQ, purchase orders, contracts and supplier rating), Supplier Quality (PPAP, audits, incoming inspection, 8D), Logistics – Inbound (gate entry, dock scheduling, GRN, 3-way invoice matching, returnable packaging) and Stores / Warehouse (bin locations, cycle counting, FIFO, kitting, line feeding). That is four departments and 20 business processes.

What is the difference between the material flow and the information flow?

The material flow is the physical path of a part — truck, gate, dock, inspection, rack, kit, line side — while the information flow is the chain of documents and system postings that authorises and records each step: RFQ, purchase order, ASN or challan, gate entry, goods receipt note, invoice match and supplier rating. Most inbound delays and disputes come from the two flows disagreeing, which is why the twin draws them as two lanes through the same four departments.

What is a goods receipt note (GRN)?

A goods receipt note is the record, usually posted in the ERP, that a delivery has physically arrived and been counted against a purchase order. It releases the material for inspection or put-away and is one of the three documents in a 3-way match, alongside the purchase order and the supplier's invoice.

Which Inward processes have case studies?

The first Inward case study is being written on Receiving (GRN) in Logistics – Inbound: automating goods receipt from gate entry to the ERP posting. Each of the 20 processes on this page will carry its case study as it is published; the department panels show the full list today so the stage is complete as a description of the inbound process.

Next step

Start where material enters your plant

Inbound is where defects and document mismatches are cheapest to catch. Bring your gate-to-GRN numbers and we map them onto this twin and agree the first process to automate.

Last updated: